2025 Drainage Projects – Ongoing and Future
Assessments/Studies
- Vesthaven Way Drainage Basin Study
- Upper Hwy 31 – Design of Remaining East Trunkline Improvements (contingent on availability of EPA grant funds)
- Upper Hwy 31 – Design of Central Trunkline Improvements (contingent on availability of EPA grant funds)
Pipe Lining Projects
- Green Glen Road
- Southwood Road
Pipe Replacement/Drainage Improvement Projects
- Comer Circle Culvert/Headwall Improvements
- Beaumont Drive Phase II Pipe Replacement
2024 Drainage Projects – Complete
Assessments/Studies
- Panorama Brook Drive Drainage Study
- Southland Drive Drainage Improvement Design
Pipe Lining Projects
- Morningstar Drive
- Oakview Lane Phase III
- Pizitz Drive
- Jacobs Road
- Paden Place
Pipe Replacement/Drainage Improvement Projects
- Merryvale Road/ Parliament Lane Drainage Ditch Improvement Project
- Upper Hwy 31 – East Trunkline Phase I (Southwood Rd/Sunset Dr) Drainage Improvement Project
- Twin Branch at Tyler Road Drainage Improvements
- Fairhaven Drive – Ditch Maintenance/Improvements
- Waldridge Road – Ditch Maintenance/Improvements
- Southland Drive Pipe Replacement
- Dolly Ridge Road Pipe Replacement
- Pipeline Road Pipe Replacement
2023 Drainage Projects – Complete
Assessments/Studies
- Twin Branch Drive at Tyler Road Drainage Improvement Design
- April Drive Drainage Study
- Fairhaven Dr/Midland Dr/Poe Dr Phase II Study – Click to view the drainage study document or a video of the presentation.
- Upper Highway 31 – East Trunkline Phase I (Southwood Rd/Sunset Dr) Design
Pipe Lining Projects
- Fairhaven Drive
- Overton Road
Pipe Replacement/Drainage Improvement Projects
- Blue Lake Drive Pipe Replacement
- Massey Road Pipe Replacement
- Comer Circle Pipe Replacement
- Buckhead Road Drainage Improvement Project
- Beaumont Drive Phase I Pipe Replacement
- Southwood Road Pipe Replacement
- Cahaba Heights Road Pipe Replacement
- Vestavia Lake Headwall Replacement
- Tyler Place Headwall Replacement
Other Drainage Project Documents for Reference
- Upper Highway 31/Shades Crest/Vestavia Lake Drainage Assessment – Click to view the final Drainage Assessment Report or the City Council Work Session project presentation (7/18/2022).
Planning Studies
- Traffic Operations APPLE Study (Phase 1) – This study was initiated by the City through the Advanced Planning, Programming and Logical Engineering (APPLE) program developed by the Regional Planning Commission of Greater Birmingham (RPCGB) and includes evaluation of traffic operations at the following intersections:
- Rocky Ridge Road at Dolly Ridge Road
- Sicard Hollow Road at Blue Lake Drive/Cahaba Heights Road (proposed roundabout) Sain Associates Engineering presentation to the Council 05.23.2022
- Rocky Ridge Road at Highway 280
- Highway 31 at Shades Crest Road
- Highway 31 at Columbiana Road/I-65 Northbound Ramps
- Highway 31 at Vestavia Plaza/City Hall
- Highway 31 at Pizitz Drive/Vestavia Forest Place
- Columbiana Road at Shades Crest Road/Vestaview Lane
- Dolly Ridge Road at Gresham Drive
- Acton Road APPLE Grant (Feasibility Study) – in design phase
- Wald Park Master Plan – awaiting Community Spaces Plan approval by Council
- Crosshaven APPLE grant – for more information, visit Crosshaven Drive Corridor Study
- East Street Analysis and Planning – for more information, visit East Street Data Collection Summary